VendorsOracleprimavera_p6_professional_project_managementall versions
Vulnerabilities

Oracle Primavera P6 Professional Project Management

Ranked by severity, then by exploit likelihood. Click a CVE ID for its full record.

3CVEs
CVE-2021-2351
Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H).
Published 2021-07-20 · Modified
8.3EPSS 0.024
CVE-2019-10219
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
Published 2019-11-08 · Modified
6.5EPSS 0.022
CVE-2018-0734
Timing attack against DSA
Published 2018-10-30 · Modified
5.9EPSS 0.122